Brandhubify ERP · Product & engineering
Live

Bill of materials software: one item record from drawing to dispatch.

Engineering keeps the BOM in a spreadsheet, the drawings on a shared drive and the specs in someone's inbox — while the catalog your retailers see lives in Brandhubify. This block puts units, BOMs, routings and drawings on the same item record your catalog already uses, so an approved change reaches the plant and the catalog together.

The problem

When the BOM, the drawing and the catalog disagree

Three versions of the BOM

Engineering, purchasing and production each keep their own copy.

Changes go live by email

A component is swapped, and half the team keeps building to the old drawing.

Units don't convert

Bought in kilos, issued in grams, sold in cases — and stock never reconciles.

The catalog lags engineering

The spec sheet retailers download still shows last year's material.

How it works6 steps

From design to a released item

  1. 1

    Create the item

    One record, with its type and base unit.

  2. 2

    Set units of measure

    Purchase, stock and sales units with conversions.

  3. 3

    Build the BOM

    Levels, quantities and scrap allowance.

  4. 4

    Define the routing

    Operations, work centres, set-up and run times.

  5. 5

    Attach drawings and specs

    Under revision control.

  6. 6

    Change it through an ECO

    Propose, review, release with an effective date.

What's in it7 capabilities

BOM, routing and change control on one item record

Item master

One record per item — raw material, component, sub-assembly or finished good.

Units of measure

Buy in kilos, stock in grams, sell in cases, with conversions held per item.

Bill of materials

Multi-level BOMs with quantities, scrap allowance and effective dates.

Routings & operations

The sequence of steps, set-up and run times that turn the BOM into product.

Work centres & machines

Lines, cells and machines with their own capacity and calendar.

Engineering change (ECO/ECN)

Proposed, reviewed and released changes, with what each one affects.

Spec & drawing revisions

Controlled revisions of drawings and specs, attached to the item they describe.

In numbers

Worked example: one item, four units

Illustrative. With conversions held on the item, purchasing, the line and sales all read the same stock in their own unit.

ItemCocoa powder
Purchase unit25 kg bag
Stock unitkg (1 bag = 25 kg)
Issue unitg (1 kg = 1,000 g)
Sales unitCase of 24 × 200 g = 4.8 kg
10 bags received250 kg in stock — enough for 52 full cases
Who it's for

Who works on the item record

Design engineer

Releases BOM and drawing changes through one approval.

Production planner

Always builds to the current revision.

Product and catalog manager

Sees an engineering change reflected on the product record retailers see.

FAQ

Product & engineering in Brandhubify ERP: common questions

What is a bill of materials?

A bill of materials (BOM) lists every raw material, component and sub-assembly — with quantities — needed to make one unit of a product. Multi-level BOMs nest sub-assemblies inside finished goods.

What is an engineering change order?

An engineering change order (ECO) proposes a change to a product's design, BOM or routing. It is reviewed, approved and released with an effective date, so production and purchasing switch over at the right time.

Why keep the BOM on the same record as product information?

When the BOM, specs and drawings sit on the same item record as your catalog data, a change made by engineering is the change your retailers see — there is no second system to update. That is the approach in Brandhubify ERP, which builds on the live Brandhubify PIM.

What is the difference between an engineering BOM and a manufacturing BOM?

The engineering BOM describes the product as designed. The manufacturing BOM describes how it is built — including packaging, consumables and the order of assembly — and is the one production and costing use.